stevedoring
英 [ˈstiːvɪdɔːrɪŋ]
美 [ˈstivəˌdɔrɪŋ]
网络 搬运费; 装卸
双语例句
- Stevedoring tariff of non-standard containers will be implemented based on MOC's Regulations on Port Charges ( International Trade).
非标准集装箱装卸包干费,按照交通部《港口收费规则》(外贸部分)规定办法实施。 - On the Design Load Value of Forestry Stevedoring Bridge
林用装卸桥设计荷载取值的研究 - Finally, the author put forward some measures and suggestion of the constructive adjustment for Huangpu Stevedoring Company.
最后,对黄埔港务公司集装箱码头和生产布局进行结构性调整,提出工艺方案实现的措施和建议。 - All the commodities should be packed in export master cartons, which are to resist sea and auto transport handling, as well as stevedoring works.
所有的商品都应该用出口的纸箱包装,纸箱必须可以承受海陆运输及工人的搬运。 - The Hong Kong Special Administrative Region ( HKSAR) is home to three international airlines. Stevedoring tariff of non-standard containers will be implemented based on MOC's Regulations on Port Charges ( International Trade).
以香港为基地的国际航空公司有3家,其中以国泰航空公司的规模最大。二、非标准集装箱装卸包干费,按照交通部《港口收费规则》(外贸部分)规定办法实施。 - On the basis of analyzing the present development and problems of container terminal simulation technology, the set of container terminal stevedoring technology schemes, and their operation methods and processes were concluded.
在分析目前集装箱码头仿真技术发展及存在问题的基础上,归纳出集装箱码头装卸工艺的方案集合,以及作业方式和流程。 - Operation System of Container Port Area is a complicate dynamic system with discrete events, and its stevedoring operation, horizontal transportation and storage yard operation are characterized by discreteness, randomicity and dynamic.
集装箱港区作业系统是一个复杂的离散事件动态系统,船舶装卸作业、水平运输与堆场作业等具有离散、随机及动态性的特点。 - Technology Design of Grain Unloading Pit& A Stevedoring Facility in the Ports for the Grain Rail Car
散粮火车港口装卸设施&卸粮坑工艺设计 - The ideas are put forward in detail about reformation of maintenance management system of port's cargo-handling facilities by using modern facilities management theory combined with characteristics of stevedoring industry in our country. The criteria and advantages of the new systems are then discussed.
然后,根据世界先进的现代设备管理理论,结合我国装卸行业的具体特点,提出了我国港口装卸机械维修管理体制改革的设想,并对这种新体制的评价考核指标体系和特点进行了探讨。 - 24 hours working time for Nanjing stevedoring district.
南京港搬运区域24小时作业。