52古典>英语词典>man-hour翻译和用法

man-hour

英 [ˈmæn aʊə(r)]

美 [ˈmæn aʊər]

n.  工时(每人每小时的工作量)

复数:man-hours 

经济

牛津词典

    noun

    • 工时(每人每小时的工作量)
      the amount of work done by one person in one hour

      柯林斯词典

      • N-COUNT 工时(每人每小时的工作量)
        Aman-houris the average amount of work that one person can do in an hour.Man-hoursare used to estimate how long jobs take, or how many people are needed to do a job in a particular time.
        1. The restoration took almost 4,000 man-hours over four years.
          修复工作历时4年,耗费近4,000工时。
        2. ...when output per man-hour is raised.
          当每个工时的产量提高时

      双语例句

      • The structure frame of the man-hour quota calculation and its development for the civil aviation seats manufacturing are presented.
        对民航座椅工时定额制定方法进行研究,建立了工时定额系统总体结构,并提出了其实现方法。
      • Maximum percentage variation of the estimate of man-hour costs.
        工时成本估计最大增减百分比。
      • Design and develop product process, measure man-hour and design workshop layout, and improve product process and tooling.
        负责编制产品工艺,确定工时定额及工艺布局,改进优化产品工艺和工装夹具。
      • There are many difficulties in estimating the manufacturing cost and production cycle of the die in production quoting due to the uncertainty of the man-hour of die adjusting and testing.
        针对由于汽车模具调试工时难以确定所导致的制造成本和生产周期与生产实际相差较大的问题,提出了基于工时管理系统的汽车模具调试工时估计方法。
      • It contributes to specialized labour organization and can raise the operation proficiency and the availability of man-hour.
        有利于专业化劳动组织,提高操作的熟练程度和工时利用率。
      • Allowance and pure working time are the important parameters drawing up the man-hour norms in manufacturing garments.
        浮余率和纯加工时间是制定服装生产工时定额的重要参数。
      • The restoration took almost 4,000 man-hours over four years.
        修复工作历时4年,耗费近4,000工时。
      • Carry out security management system and reduce losing man-hour and working injury to lowest limit, insure safe production;
        执行公司的安全管理制度并将损失工时工伤率降低至最低限度,确保安全生产;
      • For the characteristic of complex machining kinds and generous man-hour datum in manufacture enterprise, computer aided time quota predetermining system based on primitives was developed.
        针对制造型企业加工种类复杂,工时数据量大的特点,开发了基于基元化理论的工时定额管理系统。
      • Development of man-hour quota subsystem of machining in CAPP system
        CAPP系统中机械加工工时定额子系统的开发