estimations
英 [ˌɛstɪˈmeɪʃənz]
美 [ˌɛstəˈmeɪʃənz]
n. 判断; 评价; 看法; (对水平、数量等的)估计
estimation的复数
柯林斯词典
- N-SING 评价;看法;判断
Yourestimationof a person or situation is the opinion or impression that you have formed about them.- He has gone down considerably in my estimation.
我对他的评价已经一落千丈。 - ...Lee Dixon, the best player on the pitch in his manager's estimation.
教练心目中球场上最好的球员李·狄克逊
- He has gone down considerably in my estimation.
- N-COUNT 估算;估价
Anestimationis an approximate calculation of a quantity or value.- In fact, the first group were absolutely correct in their estimation of this man's height.
事实上,第一组人对这名男子身高的估计完全正确。 - ...estimations of pre-tax profits of £2.25 million.
估计税前利润达225万英镑
- In fact, the first group were absolutely correct in their estimation of this man's height.
双语例句
- Thus, with UCPM user acceptance or systems integration, teams will be able generate more accurate estimations much earlier than the other test phases.
因此,有了UCPM用户的验证或者系统的整合,团队就能够生成更精确的比其它测试阶段更早的评估。 - Research on Multi-Channel SAR Ground Moving Target Detection and Parameter Estimations
多通道SAR地面运动目标检测与参数估计研究 - One of the most important skills in finance is being good at estimations, especially in business.
金融中最重要的技能之一是擅长估计,尤其是商业上的。 - Statistical Comparisons on Parameter Estimations in Electromigration Tests
电迁移测试中模型参数估计方法的比较 - Non-parametric estimations reveal that the fat tail of the distribution of stock return satisfies power law decay.
非参数估计显示股票收益分布的非正态性及肥尾现象,其尾部满足幂律衰减。 - Focusing effect: in crop estimations, the effect of selecting one specific part of a field over another.
聚焦效应:指在估计作物产量时,选择农田的某一部分而不是其他部分的效应。 - Parameter Maximum Likelihood Estimations from Incomplete Data in Generalized Linear Models
不完全数据广义线性模型参数的极大似然估计 - The U-tube method is recognized as a standard for industrial routine estimations.
U形管方法被公认为日常工业鉴定的标准方法。 - In particular, the team can estimate the three values lowest, nominal, and highest estimations assuming that the risk was removed, and then apply these values to reestimate the project variance.
特别地,团队可以估计三个值最低、标准和最高估计值交涉去掉了风险,并且应用这些值重新估计项目方差。 - The obvious question becomes: Why are software engineers so incapable of accurate estimations?
问题来了:为什么无法对软件工程进行精确的评估呢?
