52古典>英语词典>estimations翻译和用法

estimations

英 [ˌɛstɪˈmeɪʃənz]

美 [ˌɛstəˈmeɪʃənz]

n.  判断; 评价; 看法; (对水平、数量等的)估计
estimation的复数

柯林斯词典

  • N-SING 评价;看法;判断
    Yourestimationof a person or situation is the opinion or impression that you have formed about them.
    1. He has gone down considerably in my estimation.
      我对他的评价已经一落千丈。
    2. ...Lee Dixon, the best player on the pitch in his manager's estimation.
      教练心目中球场上最好的球员李·狄克逊
  • N-COUNT 估算;估价
    Anestimationis an approximate calculation of a quantity or value.
    1. In fact, the first group were absolutely correct in their estimation of this man's height.
      事实上,第一组人对这名男子身高的估计完全正确。
    2. ...estimations of pre-tax profits of £2.25 million.
      估计税前利润达225万英镑

双语例句

  • Thus, with UCPM user acceptance or systems integration, teams will be able generate more accurate estimations much earlier than the other test phases.
    因此,有了UCPM用户的验证或者系统的整合,团队就能够生成更精确的比其它测试阶段更早的评估。
  • Research on Multi-Channel SAR Ground Moving Target Detection and Parameter Estimations
    多通道SAR地面运动目标检测与参数估计研究
  • One of the most important skills in finance is being good at estimations, especially in business.
    金融中最重要的技能之一是擅长估计,尤其是商业上的。
  • Statistical Comparisons on Parameter Estimations in Electromigration Tests
    电迁移测试中模型参数估计方法的比较
  • Non-parametric estimations reveal that the fat tail of the distribution of stock return satisfies power law decay.
    非参数估计显示股票收益分布的非正态性及肥尾现象,其尾部满足幂律衰减。
  • Focusing effect: in crop estimations, the effect of selecting one specific part of a field over another.
    聚焦效应:指在估计作物产量时,选择农田的某一部分而不是其他部分的效应。
  • Parameter Maximum Likelihood Estimations from Incomplete Data in Generalized Linear Models
    不完全数据广义线性模型参数的极大似然估计
  • The U-tube method is recognized as a standard for industrial routine estimations.
    U形管方法被公认为日常工业鉴定的标准方法。
  • In particular, the team can estimate the three values lowest, nominal, and highest estimations assuming that the risk was removed, and then apply these values to reestimate the project variance.
    特别地,团队可以估计三个值最低、标准和最高估计值交涉去掉了风险,并且应用这些值重新估计项目方差。
  • The obvious question becomes: Why are software engineers so incapable of accurate estimations?
    问题来了:为什么无法对软件工程进行精确的评估呢?