52古典>英语词典>backlog翻译和用法

backlog

英 [ˈbæklɒɡ]

美 [ˈbæklɔːɡ]

n.  积压的工作
vt.  (使)积压; 储存

复数:backlogs 过去分词:backlogged 现在分词:backlogging 过去式:backlogged 第三人称单数:backlogs 

BEC计算机

Collins.1 / BNC.14585 / COCA.14476

牛津词典

    noun

    • 积压的工作
      a quantity of work that should have been done already, but has not yet been done

      柯林斯词典

      • N-COUNT 积压的事情;未完成的工作
        Abacklogis a number of things which have not yet been done but which need to be done.
        1. There is a backlog of repairs and maintenance in schools.
          对各学校的修缮和维护工作积压了一堆。

      英英释义

      noun

      • an accumulation of jobs not done or materials not processed that are yet to be dealt with (especially unfilled customer orders for products or services)
        1. something kept back or saved for future use or a special purpose
            Synonym:reservestockpile
          1. the large log at the back of a hearth fire

            verb

            • accumulate and create a backlog

              双语例句

              • This view can be kept open along with the Sprint Backlog view.
                这个视图可以随着SprintBacklog视图一直打开着。
              • There is a backlog of repairs and maintenance in schools.
                对各学校的修缮和维护工作积压了一堆。
              • This will cause the operations backlog items to be higher priority on the backlog.
                这会导致运营相关的待办事项条目得到更高的优先级。
              • The product backlog items are estimated.
                产品待办事项列表中的待办项都是被估算过的。
              • I recommend that you be relentless in the elimination of the backlog of defects and feature enhancements.
                我建议你在消除积压的缺陷和不断膨胀的特征时毫不留情。
              • The project backlog is the specific set of work that is required for the project.
                项目backlog是项目需要做的具体的工作集合。
              • This backlog has been worked through the system and suppliers in this sector are anticipating a difficult time ahead.
                这些积压的订单已经完成,这个行业的系统和供应商预计未来将是一段艰难的日子。
              • When I returned from maternity leave, there was a backlog of work waiting for me.
                是积压的邮件。我休产假回来上班后,有一大堆工作等着我做,可以说。
              • This list of tasks becomes the Sprint Backlog.
                任务的列表就成了所谓的代办冲刺。
              • One of the most important artifacts in the Scrum method is the Product Backlog.
                Scrum方法中一种最重要的产品,就是ProductBacklog。